Proposition 1 IRWM Plan Review Process

Proposition 1 IRWM funding is available for projects that are included and implemented in an adopted IRWM Plan, consistent with Water Code Section 10530 et seq. The IRWM Plan Review Process (PRP) is used to provide a systematic and consistent way for DWR to review IRWM plan content to determine consistency with the plan standards contained in the current IRWM Program Guidelines.

The 2016 PRP Review Tool, below, presents the 2016 IRWM Plan Standards and can also be found at the link in the 2016 IRWM Guidelines, Appendix A.

Note: Appendix H of the 2016 Proposition 1 Guidelines provides an overview of the changes between the 2016 and 2012 IRWM Plan Standards.