Nationwide Permits


Permit
Number


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
Permit
Title


Aids to Navigation
Structures in Artificial Canals
Maintenance
Fish and Wildlife Harvesting Activities
Scientific Measurement Devices
Survey Activities
Outfall Structures
Oil and Gas Structures
Structures in Fleeting and Anchorage Areas
Mooring Buoys
Temporary Recreational Structures
Utility Line Bedding and Backfill
Bank Stabilization
Road Crossings
Fills and U.S. Coast Guard Approved Bridges
Return Water from Upland Contained Disposal Areas
Hydropower Projects
Minor Discharges (25 cubic yards)
Minor Dredging (25 cubic yards)
Oil and Gas Cleanup
Surface Mining Activities (Coal)
Removal of Vessels
Categorical Exclusions
State Administered CWA 404 Programs
Structural Discharges
Headwaters and Isolated Waters
Wetland Restoration Activities
Modification of Existing Marinas
Reserved
Reserved
Reserved
Completed Enforcement Actions
Temporary Construction and Access
Cranberry Production Activities
Maintenance Dredging of Existing Basins
Boat Ramps
Emergency Watershed Protection
Cleanup of Hazardous and Toxic Waste
Reserved
Farm Buildings
Requires
Notification?


No
No
No
No
*See footnote
No
Yes
No
No
No
No
No
*See footnote
*See footnote
No
No
Yes
*See footnote
No
No
Yes
No
No
No
No
*See footnote
No
No
No
No
No
No
Yes
Yes
No
No
Yes
Yes
No
No

*The following Nationwide Permits require notification only for certain actions:

5. Small weir and flumes that involve 10-25 cubic yards of fill require notifcation.
13. Bank stabilization requires notification to the district engineer when the activity exceeds 500 feet in total length or exceeds an average of one cubic foot per linear foot of shoreline.
14. Road crossings activities under this nationwide permit require notification only if the project involves a discharge of dredged or fill material into special aquatic site.
18. Minor discharge activities under this nationwide permit require notiification only if the discharge exceeds ten cubic yards or the discharge is in a special aquatic site.
26. Headwaters and isolated waters discharges under this nationwide permit require notification only if the area of wetland disturbance exceeds one acre.